Project Mgt-Lakeland, Fl (650,000sf)

Space Planning layout (Autocad)

Facility Planning

Before moving ahead with a new Distribution center, ensure you are getting the most out of your existing facilities by evaluating your current space plan.  If you decide to build or acquire a new facility, ensure that it is implemented in the right location by conducting a network analysis.  To ensure it is built to your requirements, on time and under budget, hire an independent, professional project manager.

 

1. Space PlanningThe average 200,000sf Distribution facility can cost from $2-4 million per year.  We are consistently able to reduce these expenses by 10-20% by designing a more optimal layout to increase the storage capacity.

2. Network OptimizationThe Supply chain is an area of key strategic importance, so optimizing the Supply Chain Network should be a major initiative to any company.  We can help make Supply chain improvements a reality.

3. Project Management – manage the cross-functional design and construction of state of the art distribution centers

Network Optimization

AJP Logistics

Supply Chain Engineering